Volleyball Camp
Premier Volleyball Training Camp.
Sign Up
Summer Contest
Contest Get Fit For Summer
Enter
Menu
 
Facility Features

Utah Athletic Center (UAC) officially opened for use by teams and the general public on January 8, 2017. Built in five months by Centerpoint, the 60,000 square foot facility features 12 full, indoor volleyball courts that can also be converted into basketball or pickleball courts. The space is also suitable for indoor soccer and football training.

This state-of-the-art facility was constructed with the utmost care in every aspect of the building and construction process. The building was constructed with double concrete tilt-up panels with insulation between the two panels. Special thought was put into the flooring and lighting – both of which are Division 1 standard approved by the NCAA Women’s Volleyball Association.

UAC also houses it’s own back-up generator. This allows automatic power restoration in the entire facility in case of a power outage or failure along regular lines. This ensures that no matter what the outside conditions, tournaments and events do not have to be postponed in the event of a power outage.